Allied Vessel Fabrication

Custom process equipment for upstream oil and gas facilities.

13,260 sq ft combined shop space
5 acres secure/monitored yard for fabrication and storage
(2) 20 ton bridge cranes; 24’ hook height
(2) 1 ton station jib cranes
(1) 30’ wide x 24’ high door
(3) 20’ wide x 20’ high door
Pile supported rail section for heavy fabrication
Submerged ARC
Make up air with station venting
Rig/portable welder
7000# forklift
30,0000# forklift
32’ 30,000# gooseneck

Industrial sandblast bay
Electrostatic spray paint bay
Mobile dry abrasive blast system

IMG_7037.jpg

 

© Allied Vessel Fabrication 2016